Posts

Week 25

Image
Monday, April 30:  We started the day with in-shop Comp Testing, which included a wall layout, story pole layout, hip rafter layout, and a string line plumb bob exercise. Monday, April 30:  The lower door lock has been installed on the Zip System shed door, such that 3/16 inch clearance is maintained over the sill plate when unlocked, and the lock engages through the plate by about 3/8" when locked. Monday, April 30:  A small "strike plate" was cut from aluminum angle stock and drilled to accept mounting screws and the lock bolt.  It was then mounted to the Azek head jamb. Monday, April 30:  We removed the metal eave fascia pieces and installed additional pieces at the corner to close the corner openings where the bottom edge of the fascia meets the bottom edge of the return. We then cut, bent and installed new eave fascia pieces.  The result is more attractive and more water tight. Wednesday, May 2:  We started th...

Week 24

Image
Monday, April 23:  Today we will apply vinyl siding to the front of the Zip System shed.  This will include a small section to the left of the double door as well as the area under and on both sides of the window.  Starter strips (one shown above) were placed at the bottom between the door trim and corner boards on both sides, and a chalk line was snapped 9 3/8" up from the bottom of the starter strip.  The first course was then applied.  Both ends were checked for distance from the soffit, and then chalk lines were snapped on eight inch intervals up the wall. Monday, April 23:  The area to the left of the double door has been sided, and we are about halfway up on the remainder.  J-channel has been place along the soffit and around the windows.  Sill seal has been applied along the soffit and window bottom to allow a means to lock the top edges of the siding in.  We made frequent measurements to be sure that both ends of the...

Week 23

Image
Monday, April 16:  We installed aluminum sheet metal cut from coil stock over the eave fascia.  Two pieces were installed with an overlap of about 3".  The bottom edge was hemmed and bent at 90 degrees over the soffit edge.  The design provides a neat appearance and keeps water out. Monday, April 16:  We switched over to another shed, where we will install shingle siding.  The first step was to calculate the spacing of each course with respect to the shed windows, and then to lay out a story pole.  The story pole will be used to lay out two wooden strips which will be applied to each corner post.  This method will allow shingle spacing and exposure to be held constant on all four walls. Monday, April 16:  A vertical wooden strip with story pole marks is visible here.  A horizontal stop strip, on which the first course of shingles will rest has also been applied.  After the first course is in, the stop...

Week 22

Image
Monday, April 9:  We started the day with comp test, round 11.  In shop exercises included hip rafter layout, string line plumb bob, story pole, and wall layout. Monday, April 9:  After comp testing we started building the window trim.  We cut a piece of 1" Azek to length, ripped it to fit tight up against the soffit, and rabbeted the back side to accommodate the window flange, such that the outer part of the trim piece will rest flat against the siding. Monday, April 9:  Here's the bottom and sides of the window frame.  All three pieces have also been rabbeted on the back.  Rabbeting was done on the table saw.  The pieces were joined using the Kreg jig system,  pocket screws and glue.  The small shim in the center of the picture was used to temporarily fill the rabbet, holding the piece in alignment in the Kreg jig.  Since the glue needs time to cure, we temporarily stood down the window trim work. ...