Week 8

Image
Monday, November 20:  A rafter layout exercise.  The process begins with a series of calculations in which the total run (which can be expressed as units of run), the unit length, the line length, overhang and overall length are determined.  Other information, including the roof slope are given.  The framing square can be set to the roof slope using small gauges that are attached to the appropriate points on the square.  Then the square can be used to accurately lay out both the plum and vertical lines needed to cut out the rafter.  On the jobsight, this layout would be done on two pieces of stock, the better of which would be used as a template to trace out the other rafters. Monday, November 20:  Today we built and raised the end wall.  Sheathing will not be added until we plumb and secure the walls. Monday, November 20:  This picture shows the bottom plate of the front wall.  Two 16d common nails have...

Week 7

Image
Monday, November 13:  We started the day with shop comp test exercises.  This picture shows a wall frame mock up.  Student's are asked determine how far from straight the top plate is, and how far from plum (both front to back and side to side) the end studs are.  This is done by taking string to framing measurements.  A plumb bob is visible in the foreground. Monday, November 13:  Assembly of the shed front wall.  Left - The door rough opening framework consisting of two LSL king studs, 2 x 4 jack studs and LSL header.  Right - The rough opening framework for one of two windows.  Cripples, top and bottom, and headers are in place.  Three inch screws were used to fastens LSL components, 16d common nails for other framing.  By sighting along the front wall studs to the back wall, you can see that a front wall stud immediately to the left of the door opening is still missing. Monday, November 13: ...

Week 6

Image
Monday, November 7:  Here, an elevation is being read at each corner of the shed floor using a tape measure and laser.  Using the readings the floor will be leveled with shims. This will allow the walls to be erected plum to the shed floor.  Shims were also installed under the centers of the outside skids to prevent "bowing". Monday, November 7:  This is the beginning of the shed back wall.  Plates and studs are 2 x4, with studs mounted on 16" centers.  The interior studs are fastened to the plates, top and bottom, using 2 each 16d common nails.  Nails are driven through the plates and into the stud ends. Monday, November 7:  This is a fastening detail picture taken at the corner of the wall.  The corner post is made up of two 2 x 4's, oriented at 90 degrees.  The plates are fastened to the corner posts, at top and bottom using three, 3" screws.  The plates were predrilled to prevent splitting, and al...

Week 5

Image
Monday, October 30.  No classes due to weather conditions Wednesday, November 1:  This picture shows layout lines on the end of a shed floor system for location of a 4x 4 skid and floor joist blocking. Wednesday, November 1:  The floor has been squared and inverted.  Blocking was added and then the skids were attached. Wednesday, November 1:  A close up shows the end of one skid, bevel cut, and attached to the floor system band joist using a steel plate and ten threaded fasteners. Wednesday, November 1:  This metal bracket attached the skid at one of the floor joists.  It is also attached to the blocking by three screws. Friday, November 3:  Floor system has been turned right side up, and re-checked for square. it is now ready for sheathing. Friday, November 3:  Sheathing has been glued and nailed in place. Friday, November 3:  Chalk lines have been...