Week 14

Image
Monday, February 5:  I missed all classes today due to illness.  After shop comp testing, my crew partners installed the rake end ladders on the other end of the shed, over the large door opening.  The next step will be to mark the rafter tails for the level cut for the soffit.  This is done by placing a speed square on the roof deck just above each rafter, placing a gauge block against the end of the rafter tail and the speed square and then marking across the bottom of the gauge block onto the rafter tail. Note:  The gauge block set flush with the roof sheathing using the speed square should be only used at each end (maybe in the middle if a very long roof).  Then a line snapped to establish soffit cut line.  Some checking will show that this distance down from roof sheathing will be perfect on some tails, low on some and high on others.  This is normal.  Too many variable for this to be perfect along entire eave line.  B...

Week 13

Image
Monday, January 29:  Today we started on hip rafters.  We started in the classroom, and learned how to calculate hip rafter dimensions, and then drew a rafter on paper in the shop. Monday, January 29:  The small whiteboard diagram shows a plan view of the intersection of the ridge board and rafters on one end of a hip roof.  The hip rafter comes in from the bottom left at 45 degrees. Moving counterclockwise, we see a common rafter coming in from the end of the building, a common rafter coming from the side of the building, the ridge board, and another common rafter coming from the building side.  Also illustrated, in the center of the white board, is the 1 1/16", 45 degree ridge board width, that it used to shorten the rafter. Monday, January 29:  Above the whiteboard is a a piece of 1X material on which a hip rafter has been laid out.  The lines on the right side develop the cheek cut, where the rafter will meet the ridge. The dia...

Week 12

Image
Monday, January 22, 2018:  We started the day with the eighth round of classroom comp testing, followed by some classroom time and two rafter exercises in the shop.  Then we set up the cut station shown above.  The 2 x 4's (badly twisted) are sacrificial supports that let us support the material on both sides of the cut when cutting sheet goods. Monday, January 22:  Another sheet of Advantech roof decking has been applied.  Fasteners are 8d common nails.  Decking on this side is oriented with the tongue up.  The other side will be reversed. This will allow us to cut all of the remaining material needed from a single sheet, and use the tongue and groove interlock on all but the small end pieces. Those pieces will be secured using clips. Monday, January 22:  A shelf has been added for finish lumber and drip edge.  Roof shingles have been stockpiled.  Soon we will put braces across the top of the walls from...