Week 4

Image
Monday, October 23, Comp Test Day.  Footing forms are nearly complete.  Batter boards, visible in foreground, allow forms to be located after excavation is made. Monday, October 23.  Close up shows  footer form walls, and spreaders that maintain form width. Yellow strings are tied off to batter board kerfs, and mark the outside of the footing.  Red string marks sides of foundation walls. Monday, October 23.  This picture shows a foundation wall and footing. Wednesday, October 25, Comp Test Day, Shed Floor Construction Friday, October 27, Shed Floor Construction, progress photos to follow.

Week 3 - Building Concepts 1: Foundation, Floor System

Image
9/26/17 We located the outside corners of a 12' x 16' foundation, by driving four stakes.  The stakes were located such that the footprint was "squared", i.e. both long sides are of equal length, as are both widths and both diagonals. 9/28/17 It is difficult to see, but the stakes have been located and cut to length, dimensions checked, and strings run between stakes. The next step will be to construct batter boards, which will allow location of the foundation footings. Monday, 10/2/17 A better view.  The stake in the center-right locates one of the outside corners of the foundation.  The outside walls are marked by orange string which is attached to this stake and four others.  To the left of the stake is the first set of batter boards which will allow re-creation of footing and foundation locations after excavation.  The plastic tube on the ground is a water level which allows us to transfer elevations from the first batter board to to ...