Week 23

Image
Monday, April 16:  We installed aluminum sheet metal cut from coil stock over the eave fascia.  Two pieces were installed with an overlap of about 3".  The bottom edge was hemmed and bent at 90 degrees over the soffit edge.  The design provides a neat appearance and keeps water out. Monday, April 16:  We switched over to another shed, where we will install shingle siding.  The first step was to calculate the spacing of each course with respect to the shed windows, and then to lay out a story pole.  The story pole will be used to lay out two wooden strips which will be applied to each corner post.  This method will allow shingle spacing and exposure to be held constant on all four walls. Monday, April 16:  A vertical wooden strip with story pole marks is visible here.  A horizontal stop strip, on which the first course of shingles will rest has also been applied.  After the first course is in, the stop...

Week 22

Image
Monday, April 9:  We started the day with comp test, round 11.  In shop exercises included hip rafter layout, string line plumb bob, story pole, and wall layout. Monday, April 9:  After comp testing we started building the window trim.  We cut a piece of 1" Azek to length, ripped it to fit tight up against the soffit, and rabbeted the back side to accommodate the window flange, such that the outer part of the trim piece will rest flat against the siding. Monday, April 9:  Here's the bottom and sides of the window frame.  All three pieces have also been rabbeted on the back.  Rabbeting was done on the table saw.  The pieces were joined using the Kreg jig system,  pocket screws and glue.  The small shim in the center of the picture was used to temporarily fill the rabbet, holding the piece in alignment in the Kreg jig.  Since the glue needs time to cure, we temporarily stood down the window trim work. ...

Week 21

Image
Monday, April 2:  We cut stiles for both doors to length, allowing for a 1/8" gap between the top of the door and the header trim, and for an overhang of 1/2" below top of floor along the bottom.  We used our story board to determine the lengths of the rails. Monday, April 2:  The Azec door frames were assembled using the Kreg jig, pocket screws and PVC cement.  The next step will be to add hinge blocks and the plywood door panel. Monday, April 2:  A single hung vinyl clad window has been installed.  Prior to installation a section of clapboard had been added to the rough sill, set to tilt downward from inside to outside to allow draining of any water that seeps in during a driving rain.  Flashing (Grace Vicor Plus) was installed on the sill prior to installing the window. Monday, April 2: The next step was to install Grace Vicor Plus along the sides of the window, over the window flashing, and over the flashing which...

Week 20

Image
Monday, March 26:  Today I moved to the Zip System shed.  We started on the doorway jamb.  The jamb and door trim on this shed will be made from Azek cellular PVC boards.  The jamb needs to be installed square, that is equal widths, equal heights and equal diagonals.  The first step is to install the top jam, straight and flush with the outside sheathing.  Straightness is maintained by shimming at each fastening point. Monday, March 26: Here the side jambs have been fitted against the framing and and temporarily fastened flush with outside sheathing.  Temporary stop blocks have been added to help with alignment.  The jambs will be fastened with a pairs of special screws, place 1" in from the edges, approximately 16" OC. Monday, March 26:  Azek fastening system.  Right:  Screw; Center: Drive bit with countersink / depth limit spacer; Left: Plugs, which will cover screw heads. Wednesda...

Week 19

Image
Monday, March 19, 2018:  We started the day with shop comp testing, which included a string line / plumb bob exercise, two common rafter exercises, a board footage calculation, a story pole layout, and a wall layout. Monday, March 19:  We finished installing 3/8" thick plywood strips on the corners of the shed, which will serve as a spacer for the corner trim boards.  This spacer will hold the corner boards in proper position to meet the siding. Monday, March 19:  A close up.  Plywood strips are installed 1/2" up from the bottom of sheathing with the end strips overlapping and flush with the side strips.  Fastened with 7D galvanized box nails. Monday, March 19:  The start of one of four corner board assemblies.  We selected stock carefully and then jointed one edge straight.  Pocket holes were drilled using the Kreg bench top system. Joinery will be done with glue and special pocket hole screws.   ...