Monday, March 19, 2018: We started the day with shop comp testing, which included a string line / plumb bob exercise, two common rafter exercises, a board footage calculation, a story pole layout, and a wall layout.
Monday, March 19: We finished installing 3/8" thick plywood strips on the corners of the shed, which will serve as a spacer for the corner trim boards. This spacer will hold the corner boards in proper position to meet the siding.
Monday, March 19: A close up. Plywood strips are installed 1/2" up from the bottom of sheathing with the end strips overlapping and flush with the side strips. Fastened with 7D galvanized box nails.
Monday, March 19: The start of one of four corner board assemblies. We selected stock carefully and then jointed one edge straight. Pocket holes were drilled using the Kreg bench top system. Joinery will be done with glue and special pocket hole screws.
Monday, March 19: Here's a close up of the Kreg jig. The jig was set for the thickness of the material. A tapered drill bit extends from below the cable, to a preset depth. Special care was taken to orient the board properly, with the inside of the board downward, and the jointed edge against the fence.
Wednesday, March 21: We began the day with comp testing computer exercises.
Wednesday, March 21: This picture shows the clamping arrangement on our corner boards. A temporary guide board cut carefully to width is used to maintain corner /edge alignment. Clamps are placed to maintain alignment and prevent the boards from creeping apart when the pocket screws are inserted. After about half the pocket screws are inserted the clamps and stop board are leapfrogged to the other end of the board and joining is completed.
Wednesday, March 21: An assembled corner board, ready to be sanded and cut to length.
Wednesday, March 21: We used oil-based Kilz primer to seal the knots on all exposed finish trim. This will prevent bleed through after the finish paint is applied.
Friday, March 23: We sanded the corner boards smooth removing excess glue and bringing edges and faces flush. Next we measured each corner of the building from bottom of soffit to bottom of framing and determined that the final length of each corner board would be 91 1/16".
Friday, March 23: We cut each corner board assembly to approximate length, held it agains the return and marked the spot on the return to be notched out. A short vertical saw cut was carefully made and the material removed with a sharp chisel. This will allow the corner board to fit tight against the soffit.