Week 8



Monday, November 20:  A rafter layout exercise.  The process begins with a series of calculations in which the total run (which can be expressed as units of run), the unit length, the line length, overhang and overall length are determined.  Other information, including the roof slope are given.  The framing square can be set to the roof slope using small gauges that are attached to the appropriate points on the square.  Then the square can be used to accurately lay out both the plum and vertical lines needed to cut out the rafter.  On the jobsight, this layout would be done on two pieces of stock, the better of which would be used as a template to trace out the other rafters.





Monday, November 20:  Today we built and raised the end wall.  Sheathing will not be added until we plumb and secure the walls.




Monday, November 20:  This picture shows the bottom plate of the front wall.  Two 16d common nails have been drive through the bottom plate between each stud, into the box end joist.  The end studs have been attached to the corner posts of the front and back walls, also using 16d common nails.





Monday, November 20:  Here is a view of the front wall from inside the shed.  A plumb bob has been hung and is visible at the lower right.  String measurements will be taken and the front wall will be pulled into plumb, which should simultaneously plumb the end and back walls.





Monday, November 20:  The sill plate in the doorway has been removed in preparation for the installation of the door.