Week 10
Monday, December 4: We started the day by straightening the upper top plate on the shed back wall. We removed the existing plate, cut it, and set the bowed portion aside. We then spliced in straight material, with the splice directly over a stud.
Monday, December 4: It is difficult to see, but we laid out lines on the outside of the shed back wall to model roof rafters. A straight baseline the width of the building was snapped with a chalkline, and then we snapped a perpendicular line at the midpoint. The wooden block shown here represents the ridge board.
Monday, December 4: We ran calculations which allowed us to lay out and begin cutting rafter templates using 1x6 pine boards. These calculations also allowed us to snap the layout lines on the back of the shed wall.
Monday, December 4: Here is a close up of the birds mouth, which will let the rafter sit on the top of the wall framing and wall sheathing. The sheathing allowance line is faintly visible, and will be vertical when the rafter is in place. The longer cut is the birds mouth level cut, so called because it will be horizontal when the rafter is in place.
Wednesday, December 6: We rechecked the front wall for straightness along the top plate and braced it in preparation for installing the roof framing.
Wednesday, December 6: Here is a temporary top post, fastened to the framing above the large end door. It will support the ridge board while we install the rafters.
Wednesday, December 6: Rafters traced onto 2 x 6 stuck and partially cut. Bird's mouth cut which will rest on framing visible to the left. The rafter geometry was determined using a story pole to first work out the total rise, such that it would allow an overall building height not to exceed 10'-6". The story pole accounted for, amongst other things, the total wall height and the components that would be added above the ridge board, i.e. cap shingles, ridge vent and sheathing.
Wednesday, December 6: The first rafters are up. Here the 2 x 8 ridge board supported by the temporary post and one rafter is shown. The rafters are fastened at the top plate and at the ridge board using three 16d nails at each location. The ridge board was adjusted slightly in elevation by moving the temporary post. This adjustment allowed the rafters to fall in nicely.
Friday, December 8: Most rafters are in. 2 x 6, mounted on 24" centers.
Friday, December 8: End rafters are jointed at both the ridge board and the top plates using three each, 3" star drive screws. These fasteners are less apt to cause splitting, and help with holding precise alignment during fastening.
Friday, December 8: The birds mouth cut / top plate fit can be seen on the rafter on the left. After we get the last rafter in, we will be ready to start cutting gable end studs.